
Giken
24.0
15000
24
The Giken ECO900S represents a cutting-edge solution for deep foundation work, delivering exceptional performance across complex piling applications. This press-in piling rig combines a 15,000 kg operational footprint with a formidable 900 kN pressing capacity, enabling contractors to tackle demanding soil conditions with precision and reliability. Engineered for flexibility, the ECO900S accommodates pile elements reaching 24 meters in length, making it an ideal choice for infrastructure projects demanding adaptability without compromising structural integrity. Advanced press-in technology defines the Giken ECO900S specifications, setting this machine apart through its ability to minimize ground disturbance and eliminate traditional pile-driving vibration. The vibratory-free installation method significantly reduces noise pollution and environmental impact—critical advantages in sensitive urban environments and restricted-access sites. By adopting this quieter, non-percussive approach, the ECO900S accelerates project completion while maintaining compliance with stringent noise ordinances. The piling-rig delivers substantial operational cost advantages through its efficient hydraulic systems and reduced equipment footprint. Construction firms deploying the Giken ECO900S benefit from shorter project cycles, lower fuel consumption, and extended equipment lifespan compared to conventional pile-driving machinery. Its versatile design accommodates both vertical and battered installation configurations, providing general contractors with the specialized capability to execute complex foundation designs on schedule and budget.
| Max Drilling Depth | 24. 0 |
| Operating Weight | 1500 0 |
| Max Pile Length | 2 4 |