
Hitachi
20.0
60000
The **Hitachi KH180-3** stands as a purpose-built crawler-mounted piling rig engineered for demanding foundation construction projects. Weighing 60,000 kg, this machine delivers the structural stability and concentrated force required for modern deep foundation work. Its specialized design accommodates both pile driving and drilling operations, making it an essential asset for contractors executing complex geotechnical tasks across diverse terrain and soil conditions. The Hitachi KH180-3 specifications emphasize a compact footprint relative to its load capacity, optimizing mobility on congested job sites while maintaining the power necessary for steel and reinforced concrete pile installation. The rig's hydraulic architecture provides the precision control essential for accurate pile placement and depth management. Operators benefit from an intuitive control system that streamlines setup and operation, reducing downtime between shifts and minimizing the learning investment for skilled personnel. The machine's robust construction ensures consistent performance across extended project timelines, critical for meeting construction schedules and budget constraints. Ideal for urban redevelopment, infrastructure renovation, and industrial facility construction, the Hitachi KH180-3 piling-rig adapts seamlessly to confined spaces and challenging access conditions. Its versatility extends to auxiliary operations including micropiling, soil stabilization drilling, and foundation exploration, making it a multipurpose solution for specialized construction firms and major contractors requiring flexible deep foundation capabilities.
| Max Drilling Depth | 20. 0 |
| Operating Weight | 6000 0 |