
OMS
62.0
2160
193
The OMS OVR 120 VM is a high-performance vibratory-hammer engineered for precision pile installation and extraction in confined urban environments. With 193 kW of driving power and a robust 2160 kg operational mass, this excavator-mounted system delivers consistent performance for challenging foundation projects near residential and commercial structures. The OMS OVR 120 VM specifications reflect advanced variable moment technology that enables controlled vibration frequencies, reducing ground disturbance and structural vibration transmission to adjacent buildings. Designed for professional foundation contractors and specialized equipment operators, the OMS OVR 120 VM combines power with precision through its variable moment system. This technology allows operators to adjust driving force dynamically, making it ideal for densely developed areas where traditional pile drivers create unacceptable noise and vibration impacts. The 193 kW power output ensures efficient pile penetration while the variable moment mechanism prevents shock loads that could compromise nearby structures. The OMS OVR 120 VM represents the optimal solution for urban foundation work, emergency stabilization, and sensitive site applications. Its excavator-mounted configuration provides mobility and quick deployment, while the vibratory-hammer design ensures smooth, controlled operation. Whether driving piles for new construction or extracting existing foundations in proximity to existing structures, the OMS OVR 120 VM delivers the precision and power required for professional-grade foundation engineering.
| Max Drilling Depth | 62. 0 |
| Operating Weight | 216 0 |
| Engine Power | 19 3 |