
CMV / GEOMEC
38000
35
【Ekipman pwofesyonèl konstriksyon】The CMV / GEOMEC TRM-35/21 is a crawler-mounted hydraulic piling rig designed to meet the demanding requirements of modern fondasyon engineering. This ekipman delivers exceptional performance across varied geological conditions, from urban construction zones to remote industrial sites. Its robust build quality and precision-engineered hydraulic systems make it an ideal choice for contractors who require dependable results on challenging deep fondasyon projects. Advanced hydraulic technology powers this CMV / GEOMEC TRM-35/21, providing 35 kNm of torque output for efficient pile driving and fondasyon drilling operations. The system's responsive control mechanisms minimize cycle times while ensuring accuracy during complex boring sequences, directly contributing to accelerated project schedules and reduced operational costs. The piling-rig's hydraulic architecture supports smooth load distribution, enabling sustained performance even under continuous high-demand operation. Versatility defines the CMV / GEOMEC TRM-35/21 specifications, which accommodate steel pile installation, reinforced concrete pile driving, micropile and anchoring systems, and specialty drilling applications. The ekipman's adaptable mounting configuration and modular tooling options allow contractors to optimize performance for specific soil conditions and fondasyon types. This flexibility, combined with proven reliability, positions the CMV / GEOMEC TRM-35/21 as a strategic investment for fondasyon contractors managing diverse project portfolios.
| Operating Weight | 3800 0 |
| Max Torque | 3 5 |
Jwenn dernye lis ekipman, nouvo indistri, ak enfòmasyon sou machè la.